• Projects
  • About
  • News
  • Connect
Menu

Stone Tent Architecture

15001 140th Street
Foreston, MN, 56330
612.508.8099

Listening.Recognizing.Illuminating

Stone Tent Architecture

  • Projects
  • About
  • News
  • Connect

Sanding

February 9, 2016 Erik Johnson

As the house became enclosed and protected from the weather we began to turn our eyes to the wood we were leaving exposed in the house. Christine and I have spent hours sanding beams and columns and we have hours yet ahead of us. The elements are not particularly kind to wood, and once you see how beautiful it is after sanding you just can't stop.

In Field's Edge Progress
Comment

Concrete Floors

February 9, 2016 Erik Johnson

I am skipping over the installation of the sub slab insulation and hot water tubing since I don't have great pictures of those, but I wanted to give a brief look at when the concrete slabs were poured in the house. A flat, hard surface is a beautiful thing when you have been tramping around on gravel for months.

In Field's Edge Progress
Comment

Courtyard/Workshop/Garage

February 9, 2016 Erik Johnson

While we waited for some of the larger custom windows to arrive, the framing continued on with the utility room, garage and workshop. The three spaces form the other walls of the three sided entry courtyard.

This utility room is where the wood boiler will be installed and on the outer wall under the overhang all our wood for that boiler will get stacked on shelving.

An exterior stair for accessing the north field from within the courtyard will go in this space between the utility room and garage.

As the garage and workshop walls went up the repetition of forms started to present itself.

And our luck with no snow ran out. Beautiful, but we were not quite as far as we had hoped to be.

The tent shack and shed

The courtyard space starting to shape up.

The entry sequence from the driveway also starting to be seen, with garage to the right.

The workshop garage door instead of opening toward the driveway opens toward the courtyard space, where it can connect these spaces in the warmer months.

The angled form of the roof repeating that of the house.

The courtyard is surrounded by outdoor spaces, this covered ground level deck in the foreground, the workshop beyond, and the covered entry to the left of that.

With the fourth wall of the courtyard non-existent to the south, the field, where the gardens will be, is framed by the house and workshop. The edges of the trees take over in engaging the field and enlarging the courtyard into a single large room.

The white house wrap and snow cover blend the the house and landscape into one. A different image will emerge later as siding is added.

This sloping roof in addition to providing cover around the edge of the courtyard, collects and directs the water off the garage and workshop roof.

The four columns, not quite complete, of the courtyard help establish that space as a room.

The windows of the workshop provide view of the field and collect extra light for the space from above.

The entry walk-through is now seen as one of three openings along with the garage doors, and can also be seen as mirroring the large window of the house beyond. This structure provides a separation from the driveway as a transition and buffer to the house.

In Field's Edge Progress
Comment
← Newer Posts Older Posts →

News Archive

Featured
IMG_5690.jpg
July 15, 2026
Cross Pointe Church - Education Addition - Construction Progress
July 15, 2026
Read more →
July 15, 2026
IMG_5679.jpg
July 9, 2026
The Word & The Pulse Radio Studios Under Construction in Pequot Lakes
July 9, 2026
Read more →
July 9, 2026
013_dsc00612_89.jpg
June 29, 2026
MN Sports Cards is open for business!
June 29, 2026
Read more →
June 29, 2026
IMG_4695.jpg
October 28, 2025
Cross Pointe Church - Education Addition Groundbreaking
October 28, 2025
Read more →
October 28, 2025
MN Sports Card Rendering 072925.jpg
October 20, 2025
MN Sports Cards is starting Construction!
October 20, 2025
Read more →
October 20, 2025
IMG_4019.jpg
June 23, 2025
Larson Building Open House
June 23, 2025
Read more →
June 23, 2025
IMG_3720.jpg
March 12, 2025
IDC Automatic - Construction Progress
March 12, 2025
Read more →
March 12, 2025
IMG_3516.jpg
January 15, 2025
Gray Barkosky Group - Grand Opening
January 15, 2025
Read more →
January 15, 2025
IMG_3116.jpg
September 6, 2024
A Stair that Connects
September 6, 2024
Read more →
September 6, 2024
IMG_2986.jpg
July 29, 2024
Larson Building Office Addition - Construction Progress 2
July 29, 2024
Read more →
July 29, 2024
LB Office Rendering 1.jpg
May 17, 2024
Larson Building Office Addition - Construction Progress
May 17, 2024
Read more →
May 17, 2024
_MG_6977.jpg
December 2, 2023
Cross Pointe Church Dedication
December 2, 2023
Read more →
December 2, 2023
Larson Building Groundbreaking
November 20, 2023
Larson Building Groundbreaking
November 20, 2023
Read more →
November 20, 2023
Mechatronic Solutions, Maple Grove - Exterior Photographs
October 17, 2023
Mechatronic Solutions, Maple Grove - Exterior Photographs
October 17, 2023
Read more →
October 17, 2023
IMG_1406.jpg
October 17, 2023
Foggy Morning in April
October 17, 2023
Read more →
October 17, 2023
_MG_9485 copy.jpg
January 26, 2023
Mechatronic Solutions Construction Complete!
January 26, 2023
Read more →
January 26, 2023
IMG_6301a.jpg
October 21, 2022
Cross Pointe Church, Cambridge - Construction Progress
October 21, 2022
Read more →
October 21, 2022
IMG_0686 copy.jpg
October 17, 2022
Mechatronic Solutions Construction Progress (4)
October 17, 2022
Read more →
October 17, 2022
IMG_0402.jpg
September 6, 2022
11 Division in Buffalo, MN - Remodel
September 6, 2022
Read more →
September 6, 2022
IMG_0380.jpg
September 6, 2022
Cross Pointe Church Under Construction
September 6, 2022
Read more →
September 6, 2022
Mechatronic Solutions Construction Progress (3)
August 22, 2022
Mechatronic Solutions Construction Progress (3)
August 22, 2022
Read more →
August 22, 2022
IMG_0291.jpg
July 29, 2022
One of the Summer Projects @ Field's Edge
July 29, 2022
Read more →
July 29, 2022
IMG_0244.jpg
July 29, 2022
Mechatronic Solutions Construction Progress (2)
July 29, 2022
Read more →
July 29, 2022
Mechatronic Solutions Construction Progress
June 28, 2022
Mechatronic Solutions Construction Progress
June 28, 2022
Read more →
June 28, 2022
IMG_0077.jpg
May 24, 2022
Mechatronic Solutions Ground Breaking in Maple Grove
May 24, 2022
Read more →
May 24, 2022
IMG_0063.jpg
May 24, 2022
Midwest Steel Office Mezzanine - In Construction
May 24, 2022
Read more →
May 24, 2022
Redeemer Cov.jpg
March 6, 2021
Redeemer Covenant - Construction Progress
March 6, 2021
Read more →
March 6, 2021
IMG_8709.jpg
March 6, 2021
TyloHelo - Construction Progress
March 6, 2021
Read more →
March 6, 2021
IMG_8718 copy.jpg
March 6, 2021
Shoot Steel - Construction Progress
March 6, 2021
Read more →
March 6, 2021
IMG_7441.JPG
May 6, 2020
Hand Wash Sink
May 6, 2020
Read more →
May 6, 2020
Summary Block
This block is invalid. Please check the block settings and try again.
Featured
Aenean eu leo Quam
Aenean eu leo Quam

Quisque iaculis facilisis lacinia. Mauris euismod pellentesque tellus sit amet mollis.

Read more →

 News Categories - Field's Edge Progress / Project News

Stone Tent Architecture, LLC is a Minnesota limited liability company doing business as Stone Tent Architecture.